QUESTIONNAIRE FOR ENVIRONMENTAL APPRAISAL

(INDUSTRY SECTOR PROJECTS)

Note 1 :        All information given in the form of annexures should be part of this      file itself.  Annexures as separate files will not be accepted.

Note 2 :      Please enter x in appropriate box where answer is Yes/No

 

 

 
 

 

 

 

 


I.    General Information

 

A.                 Name of the Project                             :

 

1.                Existing project/proposed project/

expansion project/modernization project :

 

2.                If Existing/expansion/

modernization project, whether

 environmental clearance

 has been obtained                                              :    

 

B.                

 

 
Plant Capacity (TPA)                         :

 

C.                 Location

 

 

Village

Tehsil

District

State

 

 

 

 

 

 

 

 

 

 

 
D.        Geographical Information

1.                  Latitude

 

2.                 

 

 
Longitude

 

3.                 

 

 
Elevation above Mean

      Sea Level  (metres)

 

 

 
                        4.         Total Area envisaged for setting up

of project (in ha.)

 

 

 
            5.        Nature of terrain (hilly, valley, plains,

Coastal plains etc.)

 

 

 
            6.        Nature of Soil (sandy, clayey, sandy

 

 

 

 
                       loam etc.).

 

7.        Permeability (cm/sec)

 

 

 

 

E.         Alternate sites considered

1.                  ____________________________________________________

2.                  ____________________________________________________

3.                  ____________________________________________________

4.                  ____________________________________________________

 

F.       Reasons for selecting the proposed site based on comparative evaluation of       

          environmental considerations

II.                II.        Environmental Setting

           

A.        Current land usage of the proposed project site Area (in hectares) .

1.

 

 

 

 

 

 

 

 

 

 
     Notified Industrial Area/Estate

2.     

 

 
  Agricultural                                                          

Irrigated                      

                                    Unirrigated                  

3.        Homestead

4.        Forest                                                                 

5.        Grazing

 

 

 
 


6.     Fallow     

   7.     Marshy

 

 

 
 

 

 


 

 
                       8.     Mangroves           

 

 

 
                        9.     Others (Pl. specify)                                              

            Total    

 

 
             B.  Please indicate area earmarked for each of the following (in ha.)

1.                  Plant Facilities

2.                 

 

 
Ash Disposal

3.                 

 

 
Storage (Fuel)

 

 
                        4.         Storage (Water)

5.                 

 

 
Storage (Hazardous Waste)

6.                 

 

 
Storage (Hazardous Chemicals)

7.                 

 

 
Storage (Others)

 

 
                        8.         Approach Road(s)

 

 

 

 
                        9.         Township

                        10.       Green Belt

11.             

 

 

 

 
Others (Please specify)

                                               

                                                Total   

            C.      Is the proposed site located in a low-lying area ?

 

 

 

 
         Yes                                     No

If yes,

 1.        Level before filling (above MSL, in metres) ___________________

2.                Level after filling (above MSL in metres)_______________________

 

Quantity of Fill Material required (in cum.)

Source

 

 

 


D.          Proximity to sea/water bodies :

 

 

Sea

Other Water bodies like River/creek/lake etc.

(Please specify)

Distance of site* boundary (in m)

 

 

Distance of plant facilities (in m)

 

 

                     *   From  highest flood line/high tide line

 

            E.         Whether any of the following exist within 7 km. of the periphery of the project

                        site. If so, please indicate aerial distance and the name of the eco-system as

                        given under the Table.

S.No.

 

Name

Area falling within 7 km periphery of project (ha.)

Aerial Distance (in km.)

1

National Park/Wildlife Sanctuary

 

 

 

2

Tiger Reserve/Elephant Reserve / Turtle Nesting Ground

 

 

 

3

Core Zone of Biosphere Reserve

 

 

 

4

Habitat for migratory birds

 

 

 

5

Lakes/Reservoir/Dams

 

 

 

6

Stream/Rivers

 

 

 

7

Estuary/Sea

 

 

 

8

Mangroves

 

 

 

9

Mountains/Hills

 

 

 

10

Notified Archaeological sites

 

 

 

11

Any other Archaeological sites

 

 

 

12

Industries/Thermal Power Plants

 

 

 

13

Defence Installation

 

 

 

14

Airports

 

 

 

15

Railway Lines*

 

 

 

16

National / State Highways*

 

 

 

* 0.5 km from Railway lines/National / State Highway should be maintained.

            F.     Description of the flora/vegetation within 7 km under following headings.

1.                  Agricultural crops :  ______________________________________

2.                  Commercial crops : _______________________________________

3.                  Plantation :             _______________________________________

4.                  Natural Vegetation/Forest Type :-____________________________

5.                  Grass Lands : ____________________________________________

6.                  Endangered species : ______________________________________

7.                  Endemic species : _________________________________________

8.                  Others (Please Specify) : -___________________________________

G.      Description of fauna (non-domesticated) within 7 km under following headings.

1.                  Total listing of faunal elements

2.                  Endemic fauna species

3.                  Endangered Species

4.                  Migratory species

5.                  Route of migratory species of birds and mammals

6.                  Details of aquatic fauna (if applicable)

 


III.     Meteorological Parameters

A.        Seasonal – Monitoring Data (continuous monitoring for one full season except monsoon     should be carried out)

1.                  Temperature (in 0C)

 (a) Maximum_______       (b) Minimum______     (c) Mean___________

            2.         Rain fall (in mm) ______________________________________

  (a) Maximum_______    (b) Minimum______   (c)Mean___________               

           3.         Mean value of humidity (in %)

           4.         Inversion occurrence

                        (a)  In percentage                     (b)  Height in meters

                        5.         Seasonal Wind-rose pattern (16 points on compass scale)

                        6.         Hourly Mean Meteorological data (based on one full season data

            collected at site required as input for air quality modeling)

Hour

Low/Medium Cloud amount (in OCTAS)

Wind Speed in (Km/h)

Predominant wind direction

Ambient air temperature (in deg K)

Hourly stability

Mixing depth (in m)

1.

 

 

 

 

 

 

2.

 

 

 

 

 

 

3.

 

 

 

 

 

 

…..

 

 

 

 

 

 

……

 

 

 

 

 

 

23.

 

 

 

 

 

 

24.

 

 

 

 

 

 

 

Attach additional sheet as required.

.

IV.              Ambient Air Quality Data

            [Frequency of Monitoring should be as per guidelines of CPCB and monitoring should cover one full season (excluding monsoon)]

A.                 Season and period for which monitoring has been carried out

B.                 Frequency of sampling

C.                 Number of samples collected at each site.

Date, Time & Location

Wind direction & Speed

24 hourly Concentration as monitored (in mg/m3.)

SPM, RPM, SO2,Nox,CO

Permissible Standard(As per EPA/SPCB consent)

Remarks (Name of the instrument and sensitivity)

 

 

 

 

 

 

 

           

D.        24 hourly concentrations (in mg/m3)     

   Pollutant(s)

    Maximum

     Minimum

         Mean

          98%

SPM

 

 

 

 

RPM

 

 

 

 

SO2

 

 

 

 

NOx

 

 

 

 

CO

 

 

 

 

 

E.  Specific air pollution issues in the project area.


V.      Manufacturing Process details

A.                 Raw materials (including process chemicals, catalysts, & additives).

List of raw materials to be used at all stages of manufacture

‘Physical and chemical nature of raw material

‘Quantity (tonnes/month) full production capacity

Source of materials

Means of transportation (Source to storage site) with justification

 

 

 

 

 

 

 

 

 

 

B.                 Brief description of the process                                                 :

C.                 Details of process technology know how/collaboration  :

D.        Production profile (tonnes/year)

Name of Products, Byproducts and Intermediate Products

Existing

Proposed activity

(new/modernization/expansion)

Total

A.     Main Products

1.

2.        

 

 

 

B.     By-Products

1.

2.

 

 

 

 

C. Intermediate

Products

1.

2.

 

 

 

 


 

D.                 Means of transportation of raw material and final products

Means of Transport                  Raw material                            Final Product

 

 

 

 
                                                            ( in TPA )                                 ( in TPA )

            1.        Road

 

 

 

 
                        2.        Rail                                                                                                      

 

 

 

 
                        3.        Pipeline                                                                                    

 

 

 

 
                        4.      Others, Please specify                                                                 

VI.    Water

          A.          Water Requirement (cum/day)

Purpose

Avg.

Demand

Peak

Demand

Source

Type Treated /

untreated/Fresh/

Recycled

Remarks

 

1. Project

   (i) Process

   (ii) Cooling water

  (iii) DM water

(iv)    Dust

     Suppression

(v)  Drinking

(vi) Green Belt

(vii)  Fire Service

(viii) Others

2. Township

(i)    Green Belt

(ii)   Drinking

(iii) Others (Please specify)

 TOTAL

                           

 

 

 

 

 

             B.       Source of Raw Water Supply

 

S.No.

Source

Cu.m./hr

Cu.m./day

1

Sea

 

 

2

River

 

 

3

Groundwater

 

 

4

Other surface water bodies (Please specify)

 

 

 

           C.        Lean Season flow in case of surface water source (cusecs/cumecs) 

D.        Groundwater (a) Recharge Rate/Withdrawal rate

1.         Ground water level (metres)

 

 
               (i)        Premonsoon

 

 
               (ii)      Postmonsoon

(to be obtained from Central/State Ground water authorities)

E.        Competing Users of the Water Source   :

S.No.

Usage

Present Consumption (cu.m/day)

Addition Proposed as per local plan

           Total

 

 

Surface

Ground

Surface

Ground

Surface          

Ground

1

Irrigation

 

 

 

2

Industry

 

 

 

3

Drinking

 

 

 

4

Others (Please specify)

 

 

 

 

Total

 

 

 

 

F.         Physico- chemical analysis of Raw Water at intake point

G.        Physico- chemical analysis of treated water to be used in project/township.

H.        Waste Water Management

1.         Description of waste water treatment plan with flow chart

2.         Characteristics of discharge stream(s) before and after treatment

Item

Characteristics

Before

After

 

 

 

3.          Daily discharge (m3/day) from different sources

 

 
                                    (a)     Plant operation               

 

 
                                     (b)    Workshop

 

 

 

 
                                    (c)     D.M. Plant effluent                                 

 

 
Text Box:        (d)    Domestic

                                    (e)     Other (specify)

 

 

 

 
                                                    Total                                   

 

 
            4.         Quantity of water recycled

(a)  (in  %)

 

 
            (b)  (in cum/day)

            5.        Details of recycling mechanism

6.       Mode of final discharge/disposal of treated effluent          :

Mode

Length (in m.)

Quantity(in m3/day)

(i) Open Channel

 

 

(ii) Pipeline

 

 

(iii) Others (Please specify)

 

 

                                        Total

 

 

 

7.  Point of final discharge                     :

Final Point

Quantity discharged (in m3/day)

(i) Green belt within the plant/township

 

(ii) Agricultural land

 

(iii) Fallow Land

 

(iv) Forest Land

 

(v) River/Stream

 

(vi) Lake

 

(vii) Estuary

 

(viii) Sea                      

 

                               Total

 

 

                        8.       Lean season flow rate in case of discharge in a river/stream (cusecs)

                                                                                             

 

 
9.       Downstream users of water (in case of river, reservoir, lake(cusecs)

                                                                        (a)   Human

 

 
                                                          

                                                           (b)   Irrigation

 

 
 


                                    (c)   Industry

 

 
 


                                                            (d)  Others (Pl. specify)

10.    Analysis of river water 100 metres upstream of discharge point and 100 metres downstream of discharge point (except in rainy/monsoon season) along with details of aquatic life.

 

11.         What is the predicted impact on water quality of the receiving body due to discharge ? (Briefly state the prediction tool adopted)

 

 

 

VII.     Solid Waste Management

1.      Details

S.No

Source

Qty(TPM)

Form (Sludge/Dry/Slurry etc.)

Composition

.1

Raw water treatment plant

 

 

 

2

ETP

 

 

 

3

Process

 

 

 

4

Spent Catalyst

 

 

 

5

Oily Sludge

 

 

 

6

Others (Pl. Specify)

 

 

 

 

B.                 If waste(s) contain any hazardous/toxic substance/radioactive

                     materials or heavy metals, provide data and proposed precautionary

                        measures.

C.                 What are the possibilities of recovery and recycling of wastes?

D.                 Possible users of Solid Waste (s).

E.                  Method of disposal of solid waste (s)

    

             Method                                  Qty(TPM)

1.                 

 

 
Landfill            

2.                 

 

 
Incineration

3.                 

 

 
Recovery

4.                 

 

 
Downstream users


F.      In case of landfill

 

 

 

 
                        1.   Is solid waste amenable for                YES             NO

                              landfill

 

 

 

 

 

 
                        2.   Dimensions of landfill

                           

 
 


                        3.   Life of landfill                                                                                        years       

4.   Proposed precautionary and mitigative measures along with design  features

G    In case of incineration:

                       1.  Details of incinerator

 (i)   Type

 (ii)        Size           

 (iii)       Capacity

(iv)   Fuel                                               

                       2.  Likely composition and quantum of emissions

S.No.

Composition

Quantity (in cu.m/hr)

 

 

 

 

 
VIII.    Noise Pollution Control and Management

A.                   

 

 
Source

B.                    Level at Source (dB)   

C.                   

 

 
Level at project boundary Capacity (dB)

D.                   

 

 
Abatement measures (give source-wise details)

 

 

 

 

 

 

 

 

 

 

IX.            Fuel/Energy Requirements

             

                  A.          Total Power Requirement (MW)

 

 

Project

Township

Other(pl.specify)

Total

Present (in existing)

 

 

 

 

Proposed

 

 

 

 

Total

 

 

 

 

 

            B..      Source of Power (MW)

 

 

SEB/Grid

Captive power plant

DG Sets

Present

 

 

 

Proposed

 

 

 

Total

 

 

 

 

C.     Details of Fuel used

S.No.

Fuel

Daily Consumption(TPD)

Calorific value (Kcals/kg)

% Ash

% Sulphur

Existing

Proposed

 

1

 

2

 

3

 

4

 

5

 

6

 

7

 

 

 

Gas

 

Naphtha

 

HSD

 

Fuel Oil

 

Coal

 

Lignite

 

Other (Pl. specify)

 

 

 

 

 

 

D.   Source of Fuel  (Distance in km)

 

 
 


                                    1.      Port

 

 
 


                                          2.     Mine

 

 
 


                         3.     Refinery

 

 
 


                                           4.     Storage depot/Terminal

 

 

E.         Mode of Transportation of fuel to site

 

 
 

 


1.      Trucks (numbers/day)  

                                   

2.     

 

 
Pipeline(length in km.)

 

 
 


3.      Railway Wagons (numbers/day )

 

X.        Atmospheric Emissions

A.     Flue gas characteristics(SPM, SO2, NOx, CO)

S.No.

Pollutant

Source of

Emission

Emission rate (kg/hr)

Concentration in flue gas (g/m3)

1

SPM

 

 

 

2

RPM

 

 

 

3

SO2

 

 

 

4

NOx

 

 

 

5

CO

 

 

 

 

B.                             Size distribution of SPM at the top of the stack

 

S.No.

Range

% by weight

1

2

3

4

Micron

1-10 Micron

10-20 Micron

<20 Micron

 


C.                             Stack  emission Details (All the stacks attached to process units, Boilers, captive power plant, D.G. Sets, Incinerator both for existing and proposed activity).

Plant section & units*

Stack No.

Height from ground level (m)

Internal Diameter (Top)

(m)

Emission Rate (kg/hr)*

Temp. of Exhaust Gases (deg K)

Exit Velocity (m/sec)

 

Exhaust Gas

Temp

Density

Specific

Heat

Volumetric

Flow

(m3)

 

1st

 

 

 

 

 

 

 

 

 

 

2nd

 

 

 

 

 

 

 

 

 

 

3rd

 

 

 

 

 

 

 

 

 

 

4th

 

 

 

 

 

 

 

 

 

 

5th

 

 

 

 

 

 

 

 

 

 

6th

 

 

 

 

 

 

 

 

 

 

7th

 

 

 

 

 

 

 

 

 

 

& so on

 

 

 

 

 

 

 

 

 

           *Note:               Please indicate the specific section to which the stack is attached.  For            e.g.: Process section, D.G. Set, Boiler, Power Plant, incinerator etc.

                                    Emission rate (kg/hr.) for each pollutant (SPM, SO2, NOx etc. should be specified.

D.                 Details of fugitive emissions (Indicate the points of fugitive emissions and quantities estimated)

 

E.         Predicted impact on air quality (as per CPCB Guidelines for conducting the air quality modelling)

 


 

XI.              Pollution load statement (Applicable to Expansion and Modernization Projects only)

 

 

Parameter

 

Existing Plant

 

Proposed Expansion/Modernization

 

Total

 

Remarks

 

 

1.      Land area (ha)

 

2.      Raw water

      (m3/day)

 

3.      Power (MW)

 

4.      Waste water (effluent generation)

(m3/day)

 

a. Process

b. Domestic

 

5.      Air emissions

(gms/hr.)

 

a. SPM

b. CO

c. SO2

d. NOx

e. Others (like HC, Cl2, NH3 etc.)

 

6.      Hazardous Chemical Storage (give item-wise)

 

7.      Solid waste

      (TPD)

 

a. Non- Hazardous

b. Hazardous

 

 

 

 

 

 

 

 

 

 

 

 

XII.  Storage of chemicals (inflammable/explosive/hazardous/toxic substances)

 

S.

No

Name

Number of Storage’s

Capacity

(TPD)

Physical and Chemical Composition

 

Consumption

(in TPD)

Maximum Quantity of storage at any point of time

Source of Supply

Means of transpor-tation

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

XIII.   Occupational Health and Industrial Hygiene.

 

 

A.              What are the major occupational health and safety hazards anticipated. (Explain briefly).

 

B.              What provisions have been made/propose to be made to conform to health/safety requirements. (Explain briefly).

 

C.              Details of personal protective equipment provided/to be provided to the workers.

 

D.              Details of proposed measures for control of fugitive emission/odour nuisance from different sources.

 

E.               Details of fire protection and safety measures envisaged to take care of fire and explosion hazards.

 

XIV.  Pollution Control Aspects

 

A.      Details of Pollution Control Systems :

 

 

S. No

 

Existing

Proposed to be installed

i)

Air

 

 

ii)

Water

 

 

Iii)

Noise

 

 

iv)

Solid Waste

 

 

 


 

B.      Efficiency of each pollution control equipment/system installed.       

 

1.  Existing Units

S.

No.

Name of the System Equipment

Design Efficiency %

Present Working efficiency %

1

 

 

 

2

 

 

 

3

 

 

 

 

2.                        Proposed Project

 

S.No.

Name of the System Equipment

Design Efficiency %

1

 

 

2

 

 

3

 

 

 

XV.      Green Belt Plan

 

A.                

 

 
Total area of project/township (in ha.)

 

B.                

 

 
Area already afforested (for existing projects), in ha.

 

 
 


C.         Area proposed to be afforested (in ha.)

 

 
 


D.        Plant species proposed

 1.    Indigenous

 

 
                                     2.   Exotic

 

 

 
            E.         Width of green belt (minimum, in m.)

                                    1.    Along plant boundary

 

 
 


2.   Roads and avenues within the plant

 

 
 


3.    Ash Dike

 

 
 


4.   Township

 

 
 


5.   Other-ornamental, garden spaces,

 

 
 


6.   Commercial plantations etc.

 

 

 

 

 

 

F.      Trees planted & proposed

                                                                                                                     Nos.

 

 

 
 


1.                Planted                               

 

 

 
 


2.        Survival rate                 

                       

                                               

            3.         List of species planted

 

 

 
 


            4.         Proposed                                            

 

 
                                                                                                               

5.         List of Species 

           

XVI.   Construction Phase Management Aspects

 

 

 

 

 
                        A. Estimated duration of construction in months

 

 

 

 

 
                        B. Number of persons to be employed for construction            

 

 

 
 


1.  Peak

 

 
 


2.  Average

 

 

C. What provision has been made for the sewage treatment for the      construction workers?

 

 

D. How the fuel (kerosene/wood, etc.) requirement of labour force will be met to avoid cutting of trees from the adjoining areas

 

E. Proposed Health care Measures with emphasis on protection from endemic   diseases.

 

F. Educational and other social welfare measures proposed.


 

 

XVII.      Human Settlement

 

S.No.

 

Aerial distance from the periphery of the site

 

 

 

Upto 500m from periphery

500m to 3000 m from the periphery

3000m to 7000m from the periphery

1

Population

 

 

 

2

Number of Houses

 

 

 

3

Present Occupational Pattern

 

 

 

 

 

XVIII.       Rehabilitation & Resettlement Plan (Wherever applicable)

 

A.      Village(s) affected by the project:

 

S. No.

Village (Tribal/Others)

Population

Occupation

Average Income per annum

 

 

 

 

 

 

 

 

 

 

 

B.     Population to be displaced

 

 

S.No

Name of Village

Population

 

 

Landoustees only

Homestead oustees only

Land and Homestead oustees

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C.     Salient features of Rehabilitation Plan.

 

(i)      Site where the people are proposed to be resettled

 

(ii)     Facilities proposed at the resettlement site

 

(iii)     Compensation package

 

(iv)     Agency/Authority responsible for their resettlement.

 

 

XIX.      Expenditure on Environmental Measures

 

A.    Capital cost of the project (as proposed to approved by the funding agency/financial Institutions

 

 
                       

(Rs. Lakhs)

 

 

B.    Cost of environmental protection measures (Rs. Lakhs)

 

S.No.

 

Recurring Cost  per annum

Capital Cost

1

Air Pollution Control

 

 

2

Water Pollution Control

 

 

3

Noise Pollution Control

 

 

4

Environment Monitoring and Management

 

 

5

Reclamation borrow/mined area

 

 

6

Occupational Health

 

 

7

Green Belt

 

 

8

Others ( Pl. Specify)

 

 

Total

 

 

 

3.    Details of organizational set up/cell for environmental management and   monitoring.

 

4.    Details of community welfare/peripheral development programmes     envisaged/being   undertaken by the project proponent        :

 

XX.      Public Hearing details :

 

 

 
A.    Date of Advertisement:

                                               

 

 
            B.    Newspapers in which the advertisement appeared

                  (with copies)

 

 
 


            C.    Date of Hearing

 

D.    Panel Present

 

            E.    List of public present along with address and occupation

 

F.         Summary/details of public hearing report

 

S.No.

 

 Issues raised

Recommendation of panel

Response of Project Proponents

1

 

 

 

 

2

 

 

 

 

3

 

 

 

 

 

The data and information given in this Performa are true to the best of my knowledge and belief

 

 

Date:                                                                            Signature of the Applicant with

                                                                                           full name & address.

     Place:

                                                                                   Given under the seal of organisation

                                                                                    on behalf of whom the applicant

                                                   is signing.

 

 

 

 

 

 

 

 

 

 


LIST OF DOCUMENTS TO BE ATTACHED WITH THE QUESTIONNAIRE

(Industry Sector Projects)

 

S.No

Documents to be Attached

1.

Topographic map of the site indicating contours (1:2500 scale)

2.

Topographic map covering 7 kms radius from the periphery of the site indicating main features

3.

Wind rose diagram of the site (Seasonal)

4.

Wind rose diagram of the site (Artificial)

5.

Site map indicating the positions of ambient air quality monitoring

stations vis-à-vis wind direction

6.

Flow sheet of the process adopted indicating mass input/output, brief description of the process including technological and engineering details

7.

Alternative technologies considered along with details of criteria used for selecting the technology and results of evaluation

8.

Approval of ground water board/ irrigation department/ Municipality etc. for supply of water

9.

Mass balance for water used by the project in a flow chart

10.

Flow chart for waste water treatment with mass balance

11.

Site map indicating solid waste disposal facilities

12.

Approval of electricity connection and supply of electricity

13.

Lay out map of the plant showing the position of stacks for deciding the inter stack distance

14.

Site map indicating the storage facilities

15.

Approval of Chief controller of explosives for lay out and storage of hazardous substances

16.

Layout of green belt indicating width on all sides, trees, lawns and bushes

17.

Copy of advertisement issued in respect of public hearing

18.

No objection certificate from the pollution control board

19

In case of proposals for expansion copies of renewals of consent from SPCB / PCC

20.

In case of expansion proposal copy of approval of factory inspector

21.

Copy of the application submitted to the State Government for the forest clearance in case diversion of forest land is involved

22.

Comments/Observations/Recommendation of Chief Wildlife Warden in case wildlife habitat/ migration path exists within 25 kilometers of the project site

23.

Hydrogeological report in case ground water is to be used and/or the area is drought prone or the waste water is likely to be discharged on land

24.

Environmental Audit report for the previous two years in case of expansion of existing undertaking

25.

In case the proposal involves installations in coastal zone, copy of the application forwarded by the State Government