PROFORMA FOR ENVIRONMENTAL APPRAISAL OF MINING PROJECTS

(MINING SECTOR PROJECTS)

Note 1 :       All information to be given in the form of Annex/s should be properly numbered and form part of reply to  this proforma.

Note 2 :       Please enter √ in appropriate box where answer is Yes / No

Note 3 :    No abbreviation to be  used - Not available or Not applicable should be clearly mentioned.

 

Note 4 :    Core  zone is the mining lease area.

                  Buffer zone in case of ML area up to 25 ha. is to be considered as 5 km all around the periphery of the core zone and for ML area above 25 ha. an area 10 km all around the periphery of the core zone.

 

Note 5 :     Adopt Scoping process in carrying out EIA study.

 

Note 6 :     Please indicate source of data.

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 


1.       General Information

 

(a)              Name of the project            :

 

(i)                 Name of the proponent        :

 

Mailing Address                   :

 

E-mail                               :

 

Telephone                         :

 

Fax No.                            :

 

(b)              Objective of the project       :

 

 

(c)      Location of mine (s)

 

Village(s)

Tehsil

District

State

 

 

 

 

 

 

 

 

 
(d)      Does the proposal relate to

 

 
 


(i)       New mine                                   Yes                        No  

 

 

 

 
 


(ii)      Expansion                                   Yes                        No

 

·                 

 

 

 

 
Increase in ML area              Yes                        No

 

·                 

 

 

 

 
Increase in annual                                                                                                     production                          Yes                        No

 

 

 

 

 
 


(iii)      Renewal of ML                             Yes                        No

 

         

 

 

 

 

 

 
(iv)     Modernisation                                  Yes                             No

 

(e)      Site Information

 

(i)       Geographical Location

 

 

 

 

 

 

 

 

 

 
 


·         Latitude                                          

 

·         Longitude

 

·         Survey of India Topo sheet number

 

·         Elevation above Mean Sea Level

 

·         Total mining lease area (in ha.)

     

 

(ii)      Dominant nature of terrain 

 

 

 

 

 

 

 

 
 


·         Flat                                                Yes                        No

 

 

 

 
 


·         Undulated                              Yes                        No

 

·         Hilly                                      Yes                        No

 

2.       Land usage of the mining lease area (in ha.)

 

 
 


(a)      Agricultural                                 

 

 
 


(b)      Forest

 

 
         

(c)      Waste land

 

 
 


(d)      Grazing

 

 
 


(e)      Surface water bodies

 

 
 


(f)      Others (Specify)

 

 
 


Total

 

 

 

3.        Indicate the seismic zone in which ML area falls. In case of zone IV & V, details of earth quakes in last 10 years.

 

(a)      Severity (Richter Scale)

 

(b)      Impact i.e. Damage to

 

 

 

 
 


·        

 

 

 

 
Life                             Yes                        No

·        

 

 

 

 
Property                       Yes                        No

·         Existing mine                 Yes                        No

 


4.    Break-up of mining lease area (in ha.) as per approved conceptual plan:

 

Purpose

Mining Lease Area

Total

Area acquired

Area to be acquired

Government

Private

Government

Private

Government

Private

Forest

Others

Agri.

Others

Forest

Others

Agri.

Others

Forest

Others

Agri.

Others

1. Area to be excavated

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. Storage for top soil

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3. Overburden / Dumps

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4. Mineral  storage

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5. Infrastructure (Workshop,      Administrative Building)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6. Roads

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7.  Railways

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8. Green Belt

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9.Tailings pond

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10.Effluent treatment plant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11.Coal handling plant /                                                                                mineral separation plant

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12. Township area

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13.Other (Specify)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TOTAL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 


5.        Township (outside mining lease)

 

 
 


(a)      Total area (in ha)

 

 
 


(b)      No. of dwelling units

 

 
         

(c)      Distance from mine site

 

6.        Distance of water bodies (in km)

 

Distance

from

 

River Bank *

Other Water bodies *

Sea / creek / lake / nalla etc.

(specify)

Mining lease boundary

 

 

 

Ancillary facilities

 

 

 

[* From highest flood line / high tide line]

 

7.        For projects falling within the Coastal Regulation Zone (CRZ)

 

 

 

 

 
Whether the mineral to be mined is of rare

nature and not available outside CRZ?                  Yes                   No

 

if yes, annex a scaled location map showing low tide line (LTL), high tide line (HTL) duly demarcated by one of the authorized agencies* [ *Director, Space Application Centre, Ahmedabad: Centre for Earth Sciences Studies, Thiruvananthapuram: Institute of Remote Sensing, Anna University, Chennai: Institute of Wetland Management & Ecological Designs, KolKata: Naval Hydrographers’s Office, Dehradun: National Institute of Oceanography, Panjim, Goa: and  National Institute of Ocean Technology, Chennai], boundary of mining lease area, distance of ML area from LTL and HTL CRZ boundary and CRZ classification of the project area as per the approved Coastal Zone Management Plan, and settlements, sand dunes, mangroves, forest land/patches, turtles breeding and nesting sites etc., if any, in the project area.

 

 

8.        Indicate aerial distance from the periphery of core zone / area from the periphery of the buffer zone to the boundary of following (up to 10 km):

 

S. No.

 Areas

Name

Aerial distance from

(in km.)

     Core *          Buffer*

      Zone             Zone

1.       

National Park / Sanctuary

 

 

 

2.       

Biosphere Reserve / Tiger Reserve / Elephant Reserve / any other Reserve

 

 

 

 

 

 

 

 

3.       

Forest (RF / PF / unclassified)

 

 

 

4.       

Habitat for migratory birds

 

 

 

5.       

Corridor for animals of schedule I & II of the Wildlife (Protection) Act, 1972

 

 

 

6.       

Archaeological sites

 *  Notified

 

   *  Others

 

 

 

7.       

 

Defence Installation

 

 

 

8.       

Industries / Thermal Power Plants

 

 

 

9.       

Other Mines

 

 

 

10.   

Airport

 

 

 

11.   

Railway Lines

 

 

 

12.   

National / State Highways

 

 

 

[*  Buffer zone in case of ML area up to 25 ha. is to be considered as 5 km all around the periphery of the core zone and for ML area above 25 ha. an area 10 km all around the periphery of the core zone].

 

9.        Description of flora & fauna separately in the core and buffer zones.*

 

[* Consult the Wildlife (Protection) Act, 1972 as amended subsequently and list species with (1) Common name (2) Scientific name and (3) under which schedule of the Wildlife (Protection) Act the identified species fall. Get the list authenticated by an Expert in the field / credible scientific institute / University / Chief Wildlife Warden office. Information to be based on field survey.]

 

A.        Flora

Core Zone

Buffer Zone

1.       Agricultural crops

 

 

2.       Commercial crops

 

 

3.       Plantation

 

 

4.       Natural vegetation / forest type

 

 

5.       Grass lands

 

 

6.       Endangered species

 

 

7.       Endemic species

 

 

8.       Others (Specify)

 

 

B.      Fauna

 

 

1.       Total listing of faunal elements

 

 

2.       Endangered species

 

 

3.       Endemic species

 

 

4.       Migratory species

 

 

5.       Details of aquatic fauna, if             

    applicable 

 

 

 

10.      Details of mineral reserves (as per approved Mining Plan)

 

 

 
Quantity (in million tonnes)

 

 
(a)      Proved

 

 

 
(b)      Indicated

 

 
          

(c)      Inferred

 

(d)      Mineable reserves

 

11.      Major geological formation / disturbances in the mining lease area

 

 

 

 

 

 

 

 
 


          (a)      Geological maps submitted             Yes                             No

 

(b)      Geological sections submitted          Yes                             No

 

 

 

 

 

 

 
(c)      Contour map  submitted                Yes                             No

 

(d)       Whether the presence, if any,

          noted of

 

 

 

 
 


(i)       Faults                               Yes                               No

 

 

 

 

 
(ii)      Dykes                              Yes                               No

 

 

 
 


 

 
(iii)      Shear Zone                        Yes                               No

 

 
 


[

 

 

 

 
(iv)     Folds                                Yes                               No

 

 

 

 

 
 


(v)      Other weak zones               Yes                               No

 

 


(e)      Source of data  (Indicate)

 

12.      Production of mineral(s) and life of mine

 

 
(a)      Rated capacity of mine mineral wise (Tonnes / annum)

 

 
(b)      Life of mine at proposed capacity (Years)

 

 
          (c)      Lease period (Years)

 

 

 

 
          (d)      Date of expiry of lease  (D /M /Y)

(e)              Indicate in case of existing mines

(i)       Date of opening of mine

 

(ii)      Production in the last 5 years                     1st year          5th  year

 

 

 

 
from year……… to year ………

                             in million tonnes.

                     (iii)    Projected production for the next                      6th to 10th year

 

 
                                    5 years  from year ……… to year

          ………..in million tonnes.

 

 

 

 

 
(iv)     Whether mining was suspended after         Yes              No

opening of the mine? 

 

 

 
If yes, details thereof including last production

figure and reason for the same.

 

 

 

 
 


(f)      Whether plans & sections provided?           Yes                         No

 

13.      Type and method of mining operations

 

TYPE

METHOD

Opencast

 

Manual

 

Underground

 

Semi-mechanised

 

Both

 

Mechanised

 

           

14.      Details of ancillary operations for mineral processing

 

 
 


(a)      Existing

 

 

 

 
 


(b)              Additional

15.      Mine details

 

(a)      Opencast mine

 

 

 
(i)       Stripping ratio (mineral in tonnes to over burden in m3)

 

 

 
(ii)      Ultimate working depth (in m bgl)

 

 

 
(iii)      Indicate present working depth in case of                                                   

existing mine (in m bgl)

 

(iv)     Thickness of top soil (in m.)

 

 
 


·         Minimum

·        

 

 
Maximum

·        

 

 
Average       

 

 

(v)      Thickness of overburden (in m.)

 

 
 


·        

 

 
Minimum

·         Maximum

·        

 

 
Average       

 

 

          (vi)     Mining Plan

 

 
 


·         Height and width of the bench in

     overburden / waste.

 

 
 


·         Height & width of the bench in ore body /

                        coal seam.

 

 
 


·         Proposed inclination / slope of the sides of the

opencast mine (separately for overburden, coal /

ore and overall slope of the pit sides) both while

operating the mine as well as at the time of

closure of the mine.

              

 

 

 
 


·         Whether transverse sections across the             Yes                No

opencast mine at the end of fifth year

                        and at the end of the life of the mine

 

 
                        have been submitted?

 

          (vii)     Type of blasting, if any, to be adopted.

 

 

 

 

(b)      Underground mine

                                                                 

(i)       Seam / Ore body  Min.Depth (m)   Max. Depth (m)   Avg. thickness (m)

 

 

 

 

 

 
 

 

 


           Rate of dip               Direction of dip

 

 
            in degree                    

 

 
 

 


         

(ii)      Mode of entry into the mine

 

 
 


·        

 

 
Shaft

·         Adit

·        

 

 
Incline

(iii)      Details of machinery

 

 

·                      

 

On surface

 

 

·                      

 

At Face

 

 

·                      

 

For transportation

 

 

·                      

 

Others

 

 

 

 
(iv)     Method of stoping (metalliferrous mines)

                    

·         Open

 

 
 


·         Filled

 

 
 


·         Shrinkage

 

 
 


·         Caving

 

 
 


·         Combination of above

 

 
 


·         Others (Specify)

            

 

 
(v)      Extraction method

[

·         Caving

 

 
 


·         Stowing

 

 
 


·         Partial extraction 

 

 

(vi)     Subsidence

 

 
 


·         Predicted max. subsidence  (in m)

 

 
 


·         Max. value of tensile strain (in mm/m)

 

·        

 

 
Max. slope change (in mm/m)

 

·        

 

 

 

 
Whether identified possible subsidence              

area(s) superimposed on Surface                   Yes                 No

                        Plan has been submitted?         

 

·         Major impacts on surface features 

like natural drainage pattern, houses, 

buildings, water bodies, roads, forest,

etc.

 

 

·         Salient features of subsidence

management (monitoring and control).

 

 

16.      Surface drainage pattern at mine site

 

 

 

 
 


(a)      Whether the pre-mining surface drainage plan             Yes                            No  

submitted?

 

 

 

 

 
 


(b)      Do you propose any modification / diversion               Yes                            No  

in the existing natural drainage pattern at any

stage? If yes, when. Provide   location    map  

indicating contours, dimensions of water body to be

diverted, direction  of  flow  of water and proposed     

route / changes, if any i.e. realignment of river / nallah / 

any other water body  falling  within  core  zone and

          its impact.

 

 

17.      Embankment and / or weir construction

 

(a)      Do you propose, at any stage, construction of

 

 

 

 
 


          (i)       Embankment for protection against flood?        Yes                            No

 

 

 

 
         

(ii)      Weir for water storage for the mine?                        Yes                            No     

 

(b)      If so, provide details thereof.

 

 

(c)               Impact of embankment on HFL and settlement

around.

 

 

(d)      Impact of weir on down stream users of water.

 

18.      Vehicular traffic density (outside the ML area)

         Type of vehicles           No. of vehicles per day

 

 

 

 
(a)      Existing

 

 

 

 

 
         

(b)      After the proposed activity

 

 

 

 

 
[

(c)      Whether the existing road                        Yes                        No

network is adequate?

If no, provide details of alternative

proposal?

 

 

 

 
19.      Loading, transportation and unloading of mineral and waste rocks on surface:           

 

 
 


(a)      Manual                                                Yes                        No

 

 
 


 

 
(b)      Tubs, mine cars, etc.                             Yes                        No

 

 

 

 

 

 
(c)      Scraper, shovels, dumpers / trucks.           Yes                        No

]

 

 

 

 
 


(d)      Conveyors (belt, chain, etc.)                    Yes                        No

 

 

 

 
(e)      Others (specify).

 

20.      Mineral(s) transportation outside the ML area

 

 

 

 

 

 

 

 

 

 
                               Qty. (in TPD)         Percentage (%)   Length (in km)

 

 
(a)      Road

 

 

 

 
(b)      Rail

 

 

 

 
(c)      Conveyors

 

 

 

 

 

 
(d)      Rope way

 

 

 

 
(e)      Water ways

 

 

 

 

 

 
(f)      Pipeline

 

 
          (g)      Others (Specify)

Total


21.    Baseline Meteorological and Air Quality data             

 

(a)     Micro-meteorological data

[Continuous monitoring through autographic instrument for one full season other than monsoon]

 

(i)      Wind rose pattern for one full season (16 points of compass i.e. N, NNE, NE, ---) based on 24-hourly data. For coastal area also furnish day-time and night time data.

 

·        Day time

 

·        Night time

 

·        24 – hours period

 

            (ii)   Site specific monitored data

 

Month

Wind Speed (kmph)

Temperature (oC)

Relative Humidity (%)

Rain Fall * (mm)

Cloud     Cover**  (Octas of sky)

 

Mean

Max.

% of calm

Mean

(Dry Bulb)

Highest

Lowest

Mean

Highest

Lowest

Total

24-hours Highest

No. of rainy days

Mean

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*     24-hours rainfall should be reported from 08:30 hrs. IST of previous day to 08:30 hrs. IST of the day.

*      Rainy day is considered when 24 hrs. rainfall is ³ 2.5 mm.

**   Visual observations of cloud cover should be recorded four times a day at regular intervals.

 

(iii)     Indicate name and distance of the nearest IMD meteorological

 station from which   climatological   data   have   been obtained   

 for reporting in the EIA report, if  any.


(b)      Ambient air quality data* (RPM, SPM, SO2, and NOx)

 

 [*Monitoring should be carried out covering one full season except monsoon – same season as in 21 (a) (i)]

 [*Frequency of sampling:  Sampling to be done twice a week for the entire season 24 hourly for SPM & RPM. For gaseous pollutants 24- hourly data be given irrespective of the sampling period. ]

           

(i)   Season and period for which monitoring has been carried out.

(ii)   No. of samples collected at each monitoring station

 

 

 

Name of monitoring equipment used

SPM

RPM

SO2

Nox

       Pb**

 

 

 

 

 

 

 Equipment sensitivity

 

 

 

 

 

 

Permissible AAQ standard (CPCB)     R

 

I

 

S

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Monitoring

Location

No. of

Samples

Drawn

 

Category*

(R,  I,  S)

 

Min.

Max.

95%

tile

Min.

Max.

95%

tile

Min.

Max.

95%

tile

Min.

Max.

95%

tile

Min.

Max.

95%

tile

Core zone

 

CA1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CA2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CA3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Buffer zone

 

BA1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BA2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BA3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*R = Residential;   I = Industrial;   S = Sensitive

 

**Pb for mineral specific sites only.

 

# Annex a location map indicating location of AAQ stations, their direction and distance with respect to project site.

 


22.      Stack and emission details , if any*

 

Sl. No.

Process / unit of operation (e.g. DG Set, Boiler)

Height of stack (m)

Internal top dia. (m)

Flue gas exit velocity (m/sec)

Emission rate (kg/hr)

Heat emission rate from top of stack (K.cal/hr)

Exhaust / Flue gas

SPM

SO2

NOx

CO

Temp

OC

Density

Specific Heat

Volumetric flow rate (m3/hr.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

23.      Details of fugitive emissions during mining operations*

24.      Air Quality Impact Prediction (AQIP)*

(a)      Details of model(s) used for AQIP including grid

size, terrain features, and input meteorological data

(b)      Maximum incremental GLC values of pollutants based on

prediction exercise

                                                                                                                                               (in μg/m3)

S. No.

Pollutants

 

Incremental Value

Ambient Air Quality

Resultant Air Quality

1.

SPM

 

 

 

2**.

SO2

 

 

 

3**.

NOX

 

 

 

 

[* Question Number 22, 23 & 24 need not be filled-in for mines having ML area of 25 ha. or less.]

 

[**Information on item no. 2 & 3 to be provided in cases with captive power generation of 500 KVA and above]


25.      Water requirement (m3/day)

 

Purpose

Avg. Demand

Peak Demand

A.  Mine site

1.       Mine operation

2.      Land reclamation

3.      Dust suppression

4.      Drinking

5.      Green Belt

6.      Beneficiation

7.      Washeries

8.      Fire Service

9.      Others (specify)

B.  Township

1.      Green Belt

2.      Domestic 

3.      Other (specify)

 

 

Total

 

 

 

26.      Source of water supply*

S. No.

Source

m3/day

1

River (name)

 

2

Ground water

 

3

Mine water (sump / pit)

 

4

Other surface water bodies (specify)

 

[*Annex a copy of sanction letter / permission from the concerned authority (Central Ground Water Authority in case of ground water abstraction is from notified area / State Ground Water Board in case of non-notified area / State Irrigation Department for surface water pumping) for drawing water.]

 

 
27.      Lean season flow in case of pumping from river / nalla (cumecs)

 


28.      Ground water potential of the study area

28.1.  Ground water availability

(a)      Range of water table (m bgl)

 

 
(i)       Pre-monsoon (April/May)

·        

 

 
Core Zone          

·         Buffer zone        

 

 
          (ii)      Post-monsoon (November)

·         Core Zone

·        

 

 
Buffer zone

 

 
(b)      Total annual replenishable recharge (million m3/ year)

·         By ground water table fluctuation method

·        

 

 
By rainfall infiltration factor method

 

 

 

 
 


(c)      Annual draft excluding estimated draft through

mine discharge (million m3/ year)

 

(d)      Estimated draft through mine discharge (million m3/ year)

 

 
(e)      Net annual ground water availability (million m3/ year)

 

 
(f)      Stage of ground water development in %

 

28.2.    Water demand  - Competing users of the water source

 

S. No.

Usage

Present Consumption (m3/day)

Additional proposed

as per local plan

(m3/day)

 

Total

(m3/day)

 

 

Surface

Ground

Surface

Ground

Surface

Ground

1

Domestic

 

 

 

 

 

 

2

Irrigation

 

 

 

 

 

 

3

Industry

 

 

 

 

 

 

4

Mining

 

 

 

 

 

 

5

Others (specify)

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

29.      Water quality*

(a)      Annex physico -chemical analysis of water at intake point **

 

(b)      In case of existing mine, annex report on quality of water discharge

i.e. complete physico - chemical analysis**

 

[*For non-discharging mines at least four ground water samples to be taken preferably from downstream direction of the mine in pre-monsoon and post-monsoon periods and analysed. For discharging mines six samples are to be analysed]

 

**All parameters as per BIS 10500. Indicate name of Methodology, Equipment used for   analysis, and Detection Level (DL) for each parameter.

*** Wherever any analytical parameter is below detection level, “BDL  (Below Detection Level) should be written instead of ‘NIL’.

30.      Impact on ground water regime / stream / lake / springs due to mine dewatering *

 

 
(a)      Radius of influence (in m)

[To be estimated based on analysis of pumping

test data and application of empirical formula]

 

 

 

 
 


(b)      Whether saline water ingress will take place?                Yes                     No

          (applicable to coastal areas)

           

(c)      Impact on stream / lake / springs

 

[* Provide a comprehensive hydro-geological assessment report if the average mine dewatering is more than 100 m3/day and or going below water table in non-monsoon period. The report should be based on preferably latest one year pre-monsoon and post-monsoon baseline data covering information on ground water situation, aquifer characteristics, water level conditions (April – May and November), estimate of ground water resources, predicted impact of the project on ground water regime and detailed remedial / conservation measures such as artificial recharge of ground water etc. The report should be based on actual field inventory out of existing wells, at least 30 observation wells in the buffer zone with supplementary information from secondary sources (mention name). For estimation** of ground water resource (refer question no. 28 above) be designated study area of the buffer zone may be sub-divided into command and non-command areas, watershed-wise (in case of hard rock / consolidated formations) / block-wise / mandal-wise in case of alluvial / unconsolidated formations)]

 

[**For estimating ground water resources in the area follow the Ground Water Estimation Committee recommendations of 1997]

31.      Waste Water Management

Mine

(a)      Daily average discharge (m3/day) from different sources

(i)       Mine water discharge during

 

 
 


·         Lean  period

 

·        

 

 
Monsoon  period

 

(ii)               

 

 

 

 
Workshop

(iii)               Domestic (mine site)

(iv)            

 

 
Beneficiation / Washeries

(v)             

 

 

 

 
Coal Handling Plant

(vi)             Tailings pond

(vii)           

 

 
Others (Specify)                              

 

 
 


Total       

 

 

 

 

 
(b)      Waste water treatment plant; flow

sheet for treatment process attached.             Yes                    No     

 

(c)      Quantity of water recycled / reused /

          to be recycled in

(i)       Percentage

         

(ii)      m3 /day 

 

(d)      Point of final discharge

 

Final Point

Quantity discharged (in m3/day)

1.    Surface

      (i)    Agricultural land

  

      (ii)   Waste land

 

      (iii)  Forest land

 

      (iv)  Green belt

 

 

2.   River / nallah

 

3.   Lake

 

4.   Sea

 

5.   Others (specify)                      

 

Total

 

 

 

 

 

 
(e)      Users  of  discharge water

(i)                

 

 

 

 
Human                             Yes                               No

(ii)               

 

 
Livestock                 Yes                               No

(iii)              

 

 
Irrigation                 Yes                               No        

(iv)            

 

 

 

 
Industry                  Yes                               No

(v)             

 

 
Others (specify)

 

 

(f)      Details of the river / nalla, if final effluent is / will be discharged (cumecs)

 

 

 

 

 
 


(i)                 Average flow rate

(ii)                Lean season flow rate

(iii)               Aquatic life

(iv)             Analysis of river water 100 meters             Yes              No     

upstream and 100 meters downstream

of discharge point submitted.

           

Township

 

 

 

 
(a)      Waste water generation from

township (m3/day)    

 

 

 

 

 
 


(b)      Are you planning to provide sewage                     Yes              No

treatment plant?

 

 

(c)      Usage of treated water

 

 

32.      Attach water balance statement in the form of a flow diagram

indicating source (s), consumption (Section-wise) and output.

 

33.            Ambient noise level leq dB(A)

Location of sampling station

Noise level

Day Time

Night Time

A. Core Zone
     CN1

     CN2

 

 

 

B. Buffer Zone

    BN1

    BN2
 

 

 

 

 

34.      Solid Waste

 

(a)              Top soil and Solid waste quantity and quality

 

Name (Lump/fines/slurry/

Sludge/others)

Composition

Quantity

(m3/month)

Method of disposal

 

Mining activity*

 

 a.  Top Soil

 

 b.  Over burden

 

 c.  Others (specify)

 

 

 

 

 

Effluent Treatment Plant (sludge)

 

 

 

 

Total

 

 

 

            [* Annex layout plan indicating the dump sites.]

 

(b)      (i)       Does waste (s) contain any

   activity*

  [ 

a.  Top Soil

  [ 

b.  Over burden

  [ 

c.  Others (specify)

 

   activity*

  [ 

a.  Top Soil

  [ 

b.  Over burden

  [ 

c.  Others (specify)

 

   activity*

  [ 

a.  Top Soil

  [ 

b.  Over burden

  [ 

c.  Others (specify)

 

   activity*

  [ 

a.  Top Soil

  [ 

b.  Over burden

  [ 

c.  Others (specify)

 
          hazardous/toxic substance/

radioactive materials or                  Yes                        No

heavy metals?

 

(ii)      If yes, whether details and             Yes                                 No

precautionary measures

          provided?

 

 

(c)      Recovery and recycling possibilities.

 

 

(d)      Possible user(s) of the solid waste.

 

   activity*

  [ 

a.  Top Soil

  [ 

b.  Over burden

  [ 

c.  Others (specify)

 

   activity*

  [ 

a.  Top Soil

  [ 

b.  Over burden

  [ 

c.  Others (specify)

 
(e)      (i)       Is the solid waste suitable for

backfilling?                                   Yes                        No

 

  [ 

a.  Top Soil

  [ 

b.  Over burden

  [ 

c.  Others (specify)

 
 

(ii)      If yes, when do you propose

to start backfilling.

                                                                                                        

      (in million m3)

Solid waste (s)

Already accumulated

(A)

To be generated

(B)

% of A & B to be backfilled

A

B

Over burden

 

 

 

 

 

Others (specify)

 

 

 

 

 

 

 

Land reclamation Plan

 

(f)      In case waste is to be dumped on the ground, indicate

 

          (i)       Associated environmental problems

      

 

 
(ii)      Number & type of waste dumps

·        

 

 
No. of external dumps                                

·         Max. projected height of dumps (in m)

·        

 

 
No. of  terraces and height of each stage

·        

 

 
Overall slope of the dump (degree)

 

·         Proposed reclamation measures

 

 

 

 

 
(iii)      Section of the waste dump in relation

          to the adjacent ground profile attached.     Yes                    No

 

35.      Fuel / Energy requirements*

[*To be furnished for mines having ML area more than 25 ha. or captive power generation of 500KVA and above]

       

(a)      Total power requirement                                                                     (in MW)

S. No.

 

Mine Site

Township

Others (specify)

Total

1

Present

 

 

 

 

 

2

Proposed / additional

 

 

 

 

         

Total

 

 

 

 

 

 

(b)      Source of power                                                                               (in MW)

S. No.

 

SEB/Grid*

Captive power plant

DG Sets

1

Present

 

 

 

 

2

Proposed

 

 

 

 

 

Total

 

 

 

 

[* Annex a copy of the sanction letter from the concerned authority]

 

 

 

(c)      Details of fuels

S.No.

Fuel

Daily Consumption (TPD)

Calorific value (Kcals/kg)

% Ash

% Sulphur

Existing

Proposed

1

 

2

 

3

 

 

HSD

 

LSHS

 

Other

(specify)

 

 

 

 

 

 

 

36.      Storage of inflammable / explosive materials

 

S. No.

Name

Number of Storages

Consumption

(in TPD)

Maximum Quantity at any point of time

1

Fuels

 

 

 

 

2

Explosives

 

 

 

 

 

 

37.      Human Settlement

 

 

Core Zone

Buffer Zone

Population*

 

 

 

No. of villages

 

 

 

Number of households village-wise

 

 

[* As per 2001 census record or actual survey]

 

38.      Rehabilitation & Resettlement (R&R) Plan*

[*Provide a comprehensive rehabilitation plan, if more than 1000 people are likely to be displaced, other-wise a summary plan]

 

(a)      Villages falling within the study area

 

                       

Villages

Number

Name

Core zone

 

 

 

500 m from the blasting site (s)

 

 

 

Buffer zone

 

 

 

Township site